Scientific Surveys Ltd The Premiere Pipeline Portal
SSL HomeAbout SSLSSL LinksContact UsFeedback SSL Store
 
PipemagPipedirPigsourceWorldpipePipeconferences
Home
Search
Start here, you'll be able to search products by Title, Publication Date, Keywords, or browse by Category.
Continue
Keep items in your cart, continue shopping
Checkout
Click here when you're done buying.
An account is required to use ssl's secure commerce engine
Once created, you may proceed to either modify your account or continue to purchase items.
View Cart
Check the items you've put in your cart for purchase.
Order Status
Find out where your order is.
 

 

     
Qty:  Add to Cart
Special! Free shipping on this item!
Title: Enbridge Northern pipeline: 25 years of operations, successes and challenges
Category: Technical papers from the Journal of Pipeline Engineering
Downloadable: Yes 
Project No.:
Research Agency:
Catalog No.: 2249s
Date of Publication: Mar 1 2012 12:00AM
Price: $25.00 US
Authors: Ingrid Pederson, Millan Sen, Andrew Bidwell, and Nader Yoosef-Ghodsi
Abstract: ENBRIDGE PIPELINES HAS operated a 324-mm (12.75-in) diameter, 869-km long, crude oil pipeline from Norman Wells, Northwest Territories, to Zama, Alberta, since 1985. This pipeline is the first completely buried oil pipeline constructed within the discontinuous permafrost zone of Canada. This pipeline was constructed over two winter seasons, and since 1985 has transported roughly 200 million barrels of crude oil to southern markets without significant interruption.

This paper reviews the design, construction, and operational challenges of this pipeline through the past 25 years. Unique and innovative aspects of this pipeline include measures taken during construction to minimize thermal disturbance to the soil, insulating permafrost slopes to minimize post-construction thaw, operating at temperatures that minimize thermal effects on the surrounding ground, accommodating ground movement caused by frost heave/thaw and slope instabilities, and evaluating the effects of moving water bodies adjacent to the pipeline right-of-way. The use of in-line inspection tools (Geopig) has been valuable as a supplement to conventional geotechnical monitoring for the evaluation and assessment the effects of ground movement to the pipeline. Finite-element pipe-soil interaction models have been developed for selected sites in order to assess the potential for slope movement to generate strains in the buried pipeline that exceed the strain capacity.

New monitoring data and findings since previous publications are also reviewed. In addition, the implications of long-term trends of increasing ground temperatures and associated changes to the geotechnical and permafrost conditions along the pipeline route will also be discussed and are relevant to other proposed pipeline and linear infrastructure projects along the Mackenzie Valley.

SSL Home Copyright | Privacy Statement